
STARS OVER THE RIVER DRIN
0.0 IMDB197869 MINS
DRAMA
The Story
After the foreign specialists leave, engineer Lulëzim is left in charge of building the Fierza Hydroelectric Power Station.

After the foreign specialists leave, engineer Lulëzim is left in charge of building the Fierza Hydroelectric Power Station.